Strategic Placement of Capacitor and DG for Voltage Improvement after Large Penetration of Renewable Energy Power Plant: An Indonesian Study

Nappu M.

7th International IEEE Conference on Renewable Energy Research and Applications Icrera 2018

Published: 2018Citations: 15

Abstract

The integration of Poso hydro power plant into the Southern Sulawesi power systems in Indonesia brings some consequences for instance under-voltage condition. Therefore, the purpose of this study is to overcome such problems by determining appropriate size and location of both reactive power compensation and distributed generations. A load flow study is utilized before and after the integration to find out weakest buses in terms of unstable voltage. Then simulation to determine size and location for both DG and capacitor bank is examined. The results show that as the best combination strategy is achieved therefore some lower voltage buses improve to the stable level at the same time.

Other files and links

Fingerprint

Renewable energySciences
CapacitorSciences
VoltageSciences
AC powerSciences
Compensation (psychology)Sciences
Computer scienceSciences
Voltage optimisationSciences
IndonesianSciences
Electrical engineeringSciences
Automotive engineeringSciences
Electronic engineeringSciences
Reliability engineeringSciences
EngineeringSciences
PsychologySciences
PsychoanalysisSciences
PhilosophySciences
LinguisticsSciences