Strategic Placement of Capacitor and DG for Voltage Improvement after Large Penetration of Renewable Energy Power Plant: An Indonesian Study
Nappu M.
7th International IEEE Conference on Renewable Energy Research and Applications Icrera 2018
Abstract
The integration of Poso hydro power plant into the Southern Sulawesi power systems in Indonesia brings some consequences for instance under-voltage condition. Therefore, the purpose of this study is to overcome such problems by determining appropriate size and location of both reactive power compensation and distributed generations. A load flow study is utilized before and after the integration to find out weakest buses in terms of unstable voltage. Then simulation to determine size and location for both DG and capacitor bank is examined. The results show that as the best combination strategy is achieved therefore some lower voltage buses improve to the stable level at the same time.