Risk of Factors Causing Delays in Road Construction Projects (Case Study on Road Project in South Sulawesi Province, Indonesia)

Abdurrahman M.A.

Aip Conference Proceedings

Published: 2022Citations: 2

Abstract

Project delays are a common occurrence in any construction project. Road constructions in South Sulawesi Province, Indonesia commonly are not resolved based on a predetermined time. Project delay will result in cost overruns which will reduce contractor profits and decline its corporate image. Therefore, a study is needed to identify the factors that cause project delays and determine the corrections that need to be made by making decisions based on the identification of various factors of delay. This paper aims to identify risk factors, determine the level of risk, and determine preventive measures against the dominant risk factors in road projects. The data were obtained through questionnaires and interviews. The Analytical Hierarchy Process (AHP) and the Risk Calculator are used to analyse the level of risk. The result reveals that the dominant risk factor causing road construction delay is less quality control followed by material delays and lack of coordination among project staff.

Access to Document

10.1063/5.0095426

Other files and links

Fingerprint

Analytic hierarchy processSciences
Identification (biology)Sciences
BusinessSciences
Control (management)Sciences
Quality (philosophy)Sciences
Project risk managementSciences
Road constructionSciences
Transport engineeringSciences
Risk analysis (engineering)Sciences
Operations managementSciences
Project managementSciences
Computer scienceSciences
EngineeringSciences
Project management triangleSciences
Operations researchSciences
BotanySciences
EpistemologySciences
Artificial intelligenceSciences
Systems engineeringSciences
PhilosophySciences
BiologySciences