Production scheduling using heuristic pour algorithm, branch and bound, and Nawaz Enscore and Ham (NEH) methods application in Butsudan industry

Indah A.B.R.

Iop Conference Series Earth and Environmental Science

Published: 2020

Abstract

Abstract Butsudan production companies have a major problem, namely that the production process has been delayed so that it is difficult to meet production targets on time. The problem is because the scheduling system used is not optimal. Based on these problems, the purpose of this study is to minimize the makespan value by determining the right sequence of jobs. In this study, the method used is the Heuristic Pour Algorithm, Branch and Bound, and NEH. Based on the results of the calculation using the company method, the makespan is 9.958,4 minutes, and the Heuristic Pour method is obtained by the makespan value of 9.461,1 minutes with job sequence J3-J2-J1-J4, the Branch and Bound method obtained by the makespan value of 9.717,3 minutes with job sequence J3-J1-J2-J4, the NEH method obtained the makespan result of 9.846,5 minutes with job sequence J2-J4-J1-J3. So using the proposed method can minimize makespan by 111,9 minutes to 497,3 minutes or about 8 hours.

Other files and links

Fingerprint

Job shop schedulingSciences
HeuristicSciences
Mathematical optimizationSciences
Upper and lower boundsSciences
Sequence (biology)Sciences
Scheduling (production processes)Sciences
Production (economics)Sciences
Computer scienceSciences
Value (mathematics)Sciences
AlgorithmSciences
MathematicsSciences
ChemistrySciences
ScheduleSciences
EconomicsSciences
Operating systemSciences
BiochemistrySciences
Machine learningSciences
Mathematical analysisSciences
MacroeconomicsSciences